Homewood Suites, Cape Canaveral
Full Interior and Exterior Renovations
- Completed repairs on 43 ceilings.
- Ensured protection of FF&E, walls, and flooring.
- Removed existing texture from entire ceilings.
- Primed rough concrete deck.
- Prepared ceilings to achieve smoothness on the concrete deck.
- Primed the entire ceiling.
- Applied knockdown texture.
- Painted the entire ceiling.
- Conducted cleanup and reinstated all FF&E.
- 51 gallons of paint
- 295 kg of joint compound
- 65 gallons of primer